|

Yorkshire Electricity requested ITG to assess a proposed new Management
Information System (Customer Billing) for good technical performance
and design practice.
The evidence
produced showed that many MIS reports could be efficiently
satisfied provided the proposed Billing System was configured
in a way to capture and report the required information. The
assement was completed by the manual checking of remaining
MIS function process paths and verified by their (non-concurrent)
performance measurement.
ITG
went on to develop the basis for YE Business Process Inteface
Tests (Supplier related requirements) as laid down by OFFER
(Office of Electricity Regulation) and specified by CIDA (Central
Integrated Design Authority).
ITG
liaised with YE's technical design authority to establish
and define the required technical architecture to support
CIDA business process interface testing. This enabled ITG
to specify the approach to interface testing, direct YE Supply
in the selection of suitable automated testing software
and to deliver the subsequent training in the use of this
software.
Visit
the Yorkshire
Electricity web site.
|